Skip to content
00387 (0)65 760 148 Srpski

One job,
start to finish

A complete tanker overhaul. 52 photos from our workshop, in the order the work happened.


As it arrived

The tanker as it came in — old graphics, worn equipment, corrosion on load-bearing parts.

  • As it arrived — workshop photo 1
  • As it arrived — workshop photo 2
  • As it arrived — workshop photo 3
  • As it arrived — workshop photo 4
  • As it arrived — workshop photo 5
  • As it arrived — workshop photo 6
  • As it arrived — workshop photo 7
  • As it arrived — workshop photo 8
  • As it arrived — workshop photo 9

Stripping down

Everything due for restoration comes off: covers, wheels, air tanks, suspension. Each part goes on its own pallet so nothing gets mixed up.

  • Stripping down — workshop photo 1
  • Stripping down — workshop photo 2
  • Stripping down — workshop photo 3
  • Stripping down — workshop photo 4
  • Stripping down — workshop photo 5

Blasting and painting

Parts are cleaned back to sound metal, then into the booth. Bolts and small fittings go for galvanising — that's what decides how long the repair will last.

  • Blasting and painting — workshop photo 1
  • Blasting and painting — workshop photo 2
  • Blasting and painting — workshop photo 3
  • Blasting and painting — workshop photo 4
  • Blasting and painting — workshop photo 5
  • Blasting and painting — workshop photo 6
  • Blasting and painting — workshop photo 7
  • Blasting and painting — workshop photo 8
  • Blasting and painting — workshop photo 9
  • Blasting and painting — workshop photo 10
  • Blasting and painting — workshop photo 11
  • Blasting and painting — workshop photo 12
  • Blasting and painting — workshop photo 13
  • Blasting and painting — workshop photo 14

Reassembly

The frame is rebuilt and the tank goes back on. Everything that came off goes back restored or replaced with new.

  • Reassembly — workshop photo 1
  • Reassembly — workshop photo 2
  • Reassembly — workshop photo 3
  • Reassembly — workshop photo 4
  • Reassembly — workshop photo 5
  • Reassembly — workshop photo 6
  • Reassembly — workshop photo 7
  • Reassembly — workshop photo 8
  • Reassembly — workshop photo 9
  • Reassembly — workshop photo 10

As it left

The same vehicle, in daylight. New paint, rebuilt suspension, working equipment — ready for work.

  • As it left — workshop photo 1
  • As it left — workshop photo 2
  • As it left — workshop photo 3
  • As it left — workshop photo 4
  • As it left — workshop photo 5
  • As it left — workshop photo 6
  • As it left — workshop photo 7
  • As it left — workshop photo 8
  • As it left — workshop photo 9
  • As it left — workshop photo 10
  • As it left — workshop photo 11
  • As it left — workshop photo 12
  • As it left — workshop photo 13
  • As it left — workshop photo 14

The same for your vehicle

Whether it's a full overhaul or a single fault — call and tell us what you need.